In July, 2018 K&L formed and poured concrete and installed this pedestrian bridge for SunCal/Argent Management in their 2,591 acre Master-Planned Community in Calimesa, CA.

This project was unique in that a 24″ casing had to be installed through the bridge to support a 12″ sewer main that connects the development to a nearby sewer lift station.

Hot-dipped galvanized Headed Anchor Bolts & Round-Bend U-Bolts for the project were sourced from Portland Bolt & Manufacturing Company – Portland, OR.

Engineering Services and Bridge provided by SPECS Civil Solutions, Encinitas, CA.

Bridge sourced from Excel Bridge Manufacturing Co, Santa Fe Springs, CA

http://suncal.com/our-communities/summerwind-trails/