Skip to content
15842 Boyle Ave, Fontana, CA 92331

K&L Contracting, Inc.

Structural Concrete, Bridges, Storm Drain and more

  • Home
  • Home
  • Projects
    • Bridges
    • Catch Basins & Manholes
    • Storm Drains
  • Projects
    • Bridges
    • Linear Accelerator Vault
    • Pump Stations
    • Precast Concrete
    • Storm Drain
  • Careers
  • Staff
  • Careers

Updates

Energy Dissipator (Storm Drain) – Lake Forest, CA

K&L completed this energy dissipator structure in Lake Forest, CA as part of the larger storm drain system for Baldwin & Sons’ community The Oaks at Portola Hills

Posted onFebruary 4, 2019February 11, 2019TagsConcrete, Energy Dissipator, Lake Forest, Portola Hills, Storm Drain

Blog Post 4

Posted onFebruary 4, 2019

Pedestrian Bridge – Redlands, CA

In December, 2017 the K&L Team completed the concrete structures and set this Pedestrian Bridge from Excel Bridge Manufacturing Co for Lennar Southern California at their Master-Planned Community in Redlands, CA.

Posted onFebruary 4, 2019February 27, 2019TagsBig R Bridge, K&L Contracting, Lennar Southern California, Pedestrian Bridge, Redlands, SPECS

Blog Post 3

Posted onFebruary 4, 2019

Precast Arch Culverts – Murrieta, CA

In August, 2017 the Team at K&L completed concrete and installation of these precast Arch Culverts for Borstein Enterprises for their 275 acre Golden City Development in Murrieta, CA. Engineering & Arch Culverts provided by SPECS Civil Solutions – Encinitas, CA

Posted onFebruary 4, 2019February 11, 2019TagsArch Culvert, Borstein Enterprises, Golden City, K&L Contracting, SPECS Civil Solutions

Blog Post 2

Posted onFebruary 4, 2019

Posts navigation

← Older posts

Secondary Menu

  • Home
  • Home
  • Projects
  • Projects
  • Careers
  • Staff
  • Careers
Proudly powered by WordPress | Theme: Professional Gallery by Automattic.